It has been a couple of weeks since the last update, there was a lot of work going on that could not really be seen, such as the intricate work within the roof area and the cable runs. This two week period has seen the roof completed, including the flat roof area to the rear, windows and doors are in which makes the building secure, 1st fix electrics conducted, the roof fully insulated (totalling 6 inches thick) and the floor area screeded with concrete. There will be no work for the next week as I am away on holiday, which gives the concrete floor some time to harden.

Tiles on the front roof area complete

Windows and Doors in

Roof complete including ridge tiles

Insulation ready to go up

The start of the insulation between the rafters

1st layer complete

2nd layer up and the 1st fix electrics can be seen


Floor screed down and drying