Progress continues at pace, with the later photos depicting the start of the roof coverings going on. The weather has been mostly on our side, the lifting of the steel ridge beam for the roof went well, with a hired hand driven fork lift making it very easy to manoeuvre into place. The roof is now water proof with the felt in place, the rear elevation flat roof will be covered next weekend. The tiles are now lifted onto the roof structure and the first fix of electrics is under way.
Gable ends ready to receive the steel roof beam
Lifting the steel beam into place made easy by this machine.
Roof rafters in place.
Although taken with a wide angle lens it gives a perspective of the studio space
Lots of unseen work complete ready for the roof materials to start going on